avril 21, 2025
Home » Delays in road traffic through speed camera marathon and traffic jams in Bavaria

Delays in road traffic through speed camera marathon and traffic jams in Bavaria

Delays in road traffic through speed camera marathon and traffic jams in Bavaria

Those who are traveling on the streets today have to bring a lot of patience. On the one hand, on Wednesday, April 9, 2025, the main day of the speed camera marathon: Speeds are increasingly set up at various points for 24 hours and police forces are stationed. And on the other hand, several traffic jams on the Bavarian roads ensured waiting times this morning.

Traffic jam on the A8 between Adelsried and Augsburg-West: 22 minutes of time loss

In particular around Augsburg, the Current map of the Ministry of Transport Red spots: Delay, traffic jam, construction site or closure. However, the longest traffic jam of around eight kilometers was on the A8 from Stuttgart towards Munich between Adelsried and Augsburg-West. There, the drivers had to drive average speed of 23 km/h and expect a loss of time of up to 22 minutes. The reason for the traffic jam was an accident with several vehicles, as could be seen from the Ministry of Transport. The end of the congestion was behind a crest between Adelsried and Neusäß.

Traffic jam on the A8 between Adelzhausen and Friedberg

And also on the A8 Munich towards Stuttgart between Adelzhausen and Friedberg there was a traffic jam of almost seven kilometers. But here the drivers had to sneak up at first: the average speed was eight km/h before going forward again around 10 a.m. Initially there was a time loss of up to an hour.

There was one between Dasing and Friedberg Accident with a truckaccording to the information from the Ministry of Transport. And between Friedberg and Augsburg-Ost, the right lane with a length was closed about 1.7 kilometers. Shortly before, there is also a construction site that runs for about half a kilometer.

Stuck in the west of Munich on the motorway ring

There was also a two-kilometer traffic jam on the A99 at the Munich-Süd-West towards Munich-Nord. More precisely between Munich-Lochhausen and Kreuz Munich-West, the average speed was nine km/h. The drivers had to expect to arrive up to 13 minutes later.

The text was last updated at 5:50 p.m. Until then, all of the delays listed had dissolved up to the traffic jam on the A8 between Friedberg and Kirchholz as a result of a narrowing of the road. Here the drivers had to expect a loss of time of three minutes.



View Original Source